Pipeline Systems for CHP Plant in Gera
Client:
ENGIE Deutschland GmbH
Project:
Construction of a CHP plant (22.5 MWel / 60 MWth), consisting of 5 CHP modules Fabr. MWM each 4.5 MWel and 3 hot water generators Fabr. Astebo each 20 MWth at the Gera Tinz site
Scope of Work:
Delivery and installation of complete pipeline systems for gas, hot water, and cooling (approx. 1200 m of pipes up to DN 400), including secondary steel construction, installation of various components such as pumps and heat exchangers, heat recovery
Period:
12/2017 – 12/2018
District Heating and Cooling
Client:
Service Gesellschaft Meerbusch Willich GmbH & Co. KG
Project:
Energy Supply OSTARA Meerbusch
Scope of Work:
Installation of approximately 4500 m main pipeline for district heating and cooling with fittings and supports, laying approximately 1800 m connection lines for approximately 110 house connections, including tapping fittings, KMR brand Isoplus with leak detection system in sizes from DN25 – DN300
Period:
01/2015 - 12/2016
Steam and Condensate Pipeline
Client:
Stadtwerke Jena Anlagenservice GmbH
Project:
Renewal of the steam and condensate pipeline at Sandweg in Jena
Scope of Work:
Dismantling, planning, and new installation of forward and return steam, condensate, and hot water pipes, approximately 550 m DN 250 in confined shaft and tunnel structures, civil engineering services, and thermal insulation
Period:
04/2014 - 02/2015
Pipelines for Wood Chip Drying
Client:
biotherm Hagenow GmbH
Project:
Wood chip drying plant
Scope of Work:
Planning, delivery, assembly, IBS, and documentation of pipelines (approx. 400 m DN 25 to DN 200) in materials P235GH and 16Mo3
Period:
02/2015 - 04/2015
Assembly of Prefabricated Pipelines
Client:
Balcke-Dürr GmbH
Project:
Revision work at the Oskarshamn Nuclear Power Plant in Sweden
Scope of Work:
Assembly of approximately 20 tons of pre-fabricated pipeline spools from DN 25 to DN 700 in materials 1.4307, 1.0345, and 1.5415 for steam and condensate lines in the Oskarshamn Nuclear Power Plant, connection to new intermediate superheaters and water separators
Period:
09/2013 - 11/2013
Oil Firing System for Electrabel Power Plant
Client:
Hitachi Power Europe GmbH
Project:
Combined Biomass - Bituminous Coal Power Plant 790 MW in Rotterdam Maasvlakte (Netherlands) for Electrabel - GDF Suez
Scope of Work:
Supply, fabrication, and installation of pipelines, supports, and components of the oil firing system
Period:
01/2012 - 05/2013
High-Pressure Pipelines for E.ON Power Plant
Client:
Hitachi Power Europe GmbH
Project:
Coal-fired Power Plant 1100 MW Maasvlakte Power Plant 3 (MPP3) in Rotterdam (Netherlands)
Scope of Work:
Supply, fabrication, and installation of boiler internal and external high-pressure steam pipelines DN 20 - 500, fittings, and secondary steel construction, pipe materials 1.0345, 1.5415, 1.7380, 1.0582, 1.7335, P91, P92, WB36
Period:
04/2012 - 03/2013