New Pump System for Lock Uelzen II

Client:
New Construction Office for the Expansion of the Mittelland Canal Hannover
Project:
Upgrade of Lock Uelzen II in the Elbe Seitenkanal
Scope of Work:
Conversion of the machine technology, including electrical equipment and controls in the 12 pump rooms of Lock Uelzen II in the Elbe Seitenkanal
Period:
06/2018 – 10/2018

Assembly of Pipe Spools, Steel Structures, and Supports in NPP Olkiluoto 2

Client:
Balcke-Dürr GmbH
Project:
Revision work, replacement of condensers, and connection pipelines in NPP Olkiluoto (Finland)
Scope of Work:
Dismantling of existing condensers, pipelines, and supports, followed by the assembly of new condensers, pipelines, and supports in the "Evacuation Rooms"
Period:
2016 - 2017 NPP Olkiluoto 2

Plant Construction for 20 MW Electric Boiler and Heat Storage

Client:
Stadtwerke Bielefeld GmbH
Project:
Expansion of heat storage capacities
Scope of Work:
Planning, supply, installation, and IBS of piping systems, including fittings, tanks, pumps, and measuring technology
Period:
02/2016 – 06/2016

Plant Technology for Electric Boiler

Client:
Stadtwerke Münster GmbH
Project:
Power to Heat Münster
Scope of Work:
Planning, design, supply, installation, and IBS of piping systems, including fittings, tanks, and pumps
Period:
09/2015 – 01/2016

Wendelstein 7-X Experiment in Greifswald

Client:
Max Planck Institute for Plasma Physics Garching (IPP)
Project:
2nd phase of the Wendelstein 7-X Experiment, Cooling Circuits (2nd planning phase, Operating Phase 1) in Greifswald
Scope of Work:
Planning, supply, installation, and IBS of 10 tons of stainless steel piping systems (materials 1.4571, 1.4435 up to DN 300, orbital welding, permeability < 1.1) including 5 tons of secondary steel construction, fittings, filters, heaters, pumps, and other plant equipment in the torus, I&C technology
Period:
11/2011 – 06/2015

Wendelstein 7-X Experiment in Greifswald

Client:
Max Planck Institute for Plasma Physics Garching (IPP)
Project:
1st phase of the Wendelstein 7-X Experiment, 1 MW Cooling Water Circuit in Greifswald
Scope of Work:
Planning, supply, installation, and IBS of 30 tons of stainless steel piping systems (materials 1.4571, 1.4435 up to DN 600, orbital welding, permeability < 1.1) including 25 tons of secondary steel construction, fittings, filters, heaters, pumps, and other plant equipment in the torus, I&C technology
Period:
01/2007 – 03/2010

Fiber Plant Teterow

Client:
Fibron AG
Project:
Construction of Fiber Plant Teterow
Scope of Work:
Planning and construction of the complete technological equipment of the fiber plant
Period:
2004 - 2005
The references mentioned here are examples. Feel free to request our complete lists of references.